How to independently connect the plot to electricity

If you become the owner of a land plot that is not connected to the mains, the first thing you need to do is take care of electrifying it at home. In order to ensure power supply to the site, it is necessary first of all to collect a package of documents, and then submit an application to RES. In this article we will try to tell how to conduct light on the site and how much the connection procedure costs.

Connection Procedure

To make it easier for you to start, to independently conduct electricity to the land, we will divide the actions into two stages: organizational measures (collection of documents, filing an application, etc.) and technical (in particular design and electrical work).

Getting permission

Organizational measures imply the submission to the energy supply organization of a package of documents, such as:

  • A copy of the passport of the citizen - the owner of the site (in the case of an application from another person, a power of attorney is attached).
  • A copy of the document confirming the ownership of the house or summer cottage.
  • The plan of the site with the location of the power receiving devices and the designation of the nearest support of the power line, as well as indicating the exact location of all engineering systems on the site, including the gas pipeline and water pipes.
  • The single-line circuit of the applicant's electrical networks.
  • Consent to the processing of personal data (in accordance with the requirements of the Federal Law "On Personal Data" No. 152 of July 27, 2006.

The list of necessary documents and the procedure for their execution and submission is best clarified in the RES.

The land data can be presented from the public cadastral map, in which the land can be found by the cadastral number of the land indicated in the documents of ownership.

Card usage

There is such a moment that if the pole from which you can connect electricity to you is further than 25 meters from the border of the site, then in order to conduct light on the site, you will have to install an additional pillar, and most likely at their own expense.

Aerial wiring

If everything is in order with this and the distances are within the normal range, there will be no difficulties, and following our recommendation, you will be able to conduct electricity to the site. Based on these documents, the energy supply company should issue technical specifications, thanks to which you can already conduct the light.

Technical specifications

According to the Decree of the Government of the Russian Federation No. 861 dated 12/27/2004 (Cl. 12), the energy supplying organization does not have the right to refuse you, and if it is not possible to connect the electricity on time, for technical reasons, to inform the deadlines for their implementation. This may be the lack of technological connectivity, this line works to the limit of its capabilities, and connecting a new subscriber will lead to a network failure. And in order to conduct light to your home, a partial or complete modernization of the power supply network is needed, which can drag on for years of waiting.

In the case of a positive answer, in a month you will have a document on hand connection agreement and technical conditions, with a permitted power of up to 16 kW (for a country house and a residential house differ), the name of the meter for electricity metering, an input circuit breaker, an RCD protective device and a sealed box for outdoor installation.

By the way, you can save a lot of time running around in instances and do what you love at that time, if you apply for electrification at home via the Internet on the site "http: //portal-ptp.rf". In short: go through registration, submit an application, attach copies of the documents described above, there is also the possibility of a preliminary application with a calculator, an indication of the amount of the bill for connecting to the electric network. In other words, on this site you can find out what documents are needed in order to conduct electricity to the site, even if it is without buildings, as well as how much it will cost to electrify an object.

Online application

Technical Activities

We take the technical condition and go to a specialized store of electrical goods. We purchase a meter, automatic machines, a sealed box for outdoor installation of an electricity meter.

We go to our personal plot, we install the box on the outer wall of the house or the prepared support, we make switching in the box according to PUE and schemes in the technical condition, or for a fee, wiring will be done by a specialist.

Shield on the pillar

Further wires from the street box must be led to the switchboard in your house (the article implies the presence of a finished electrical wiring to turn on the light, or a prepared shield with an RCD and automatic machines in the room). If the metering board stands on a separate support, far on the border of your personal plot, you can lead the cable in the ground into a trench to the electrified house. About, how to conduct electrical wiring underground do it yourself, we talked in detail.

Electricity from the post to the subscriber’s input panel will be connected by specialists of the company who will also seal the meter and draw up an act on the subscriber’s connection. The wiring and wiring of electrical wiring must be carried out in accordance with applicable standards and rules in compliance with safety precautions.Company power connection

Without fail, it is also necessary to carry out the installation of a protective ground loop, in our age of technology and electrical devices it will not be superfluous. About, how to make grounding in a private house, we told in the corresponding article.

Additionally, we recommend watching a video that shows how to conduct light from a pillar to a house:

Supply of electricity to the shield

How much is electrification

As a separate item, I would like to consider the cost of electricity to a summer cottage. The fact is, you can’t accurately name the price, because it depends on many factors, namely:

  1. The distance from the house to the source of electricity. In the city, the distance should not exceed 300 meters, in the village - 500 meters in order to invest in the minimum connection amount - 550.
  2. The region in which you are located. For example, in Moscow, bringing the electric network to your shield is more expensive than in the Kamchatka Territory.
  3. Type of connection - new or existing. Again, in the first case, it will be more expensive to conduct electricity.
  4. The voltage level is 0.4 kV or 6-10 kV. It is also an important indicator, although only 0.4 kV is used for a residential building, but still, if you want to connect a higher voltage to the object, consider this nuance.

These are the most significant factors on which the cost of power supply depends. As we said above, the exact price can be found on the site using a special online calculator. The minimum price for a power supply in 2019 is 550.

You can also find out about the procedure for connecting electricity by watching this video:

What you need to electrify your own home

That's all I wanted to tell you about how to conduct electricity to the site with your own hands and how much this procedure costs. Having familiarized yourself with the stages of work, you can proceed to the collection of documents and other actions!

It will also be interesting to read:

What you need to electrify your own home

Supply of electricity to the shield

(51 votes)
Loading...

44 comments

  • power engineer

    everything is accessible written, there is only nothing about power limiters (OM). they must be installed to control the magnitude of the power consumption. it often happens that a consumer orders 15 kW and consumes all 30 kW. For a long time I could not understand how to install when connecting the house. I turned to the company, where they sent me an assembled accounting board with built-in OM. I just have to nail to the wall and stick a grounding pin (steel reinforcement) into the ground. the fitter came and took the counter

    To answer
  • Elena

    Hello! What is the cost of supplying electricity from a country house (already electrified) to a household block at a distance of about 15 meters? Without existing outlets and shades?

    To answer
  • Dmitry

    And if the distance to the line of 10 kW is 550 meters, what to do and how much it will cost in the country

    To answer
  • VC.

    90% of the article is amateurish horror! Clarifications on this topic should be given by professionals, i.e. those who are truly “in the subject”.

    To answer
    • Yaroslav

      So write, what’s the matter? They will all thank you!

      To answer
      • Igor

        Read the PUE (metering devices are installed only indoors, etc.). I fully support the opinion of delitantism, and to be honest, this is a deliberate violation of a number of norms and requirements for the sake of oneself.

        To answer
        • Vladimir

          I don’t know how it is in the PUE, but now everyone puts electric meters on the street, in sealed boxes - for more convenient reading.

          To answer
  • Alexei

    For two years now, the company has concluded additional contracts with me, and each time they extend the installation period, and how the time comes again an additional contract

    To answer
  • Zemfira

    We spent 20 meters from the pillar to the house, and paid 49 thousand. Talk about 550 is very fun. Where is it?

    To answer
    • Master

      550 this in order to conclude an agreement on technical connection and another 250 for checking the meter, then from 15 to 30 thousand go to materials and connection

      To answer
      • Sergei

        For the materials - it’s clear, but for what kind of connection work should I pay? Installation of wires, meter, cabinet. And in addition still the supplying organization can take a payment?

        To answer
  • gun

    We have this service costs 35,000

    To answer
  • Lyudmila Viktorovna

    The management company demanded from me 390,000 rubles to bring electricity to the house in the cottage village. Is such a price right?

    To answer
    • Admin

      Request an estimate of all types of work. The cost of poles, wires and related material, man hours and the cost of special equipment. You can also independently, on your own, conduct a wire to your site, and the management company will connect.

      To answer
    • Lyudmila

      And from me 1400000r for connection in the village ((

      To answer
      • Lyokha

        for this money, you can put yourself an autonomous power supply (((

        To answer
  • Marina

    Gardeners conduct electricity, a pole from my house 10 meters, they asked 150,000, they take 80,000 from mine, if I apply to the RES in how much will they take from me?

    To answer
  • Dmitry

    laying a power line to the borders of the site in the city of 300m, in the village of 500m due to the network company.

    To answer
    • Sergei

      And if the distance from the pillar to the border of the site is 514 meters, what should I do?

      To answer
  • Nataliya

    Good day! Next to the house we have private networks (HOA, which is already gone), he asks for 200,000 for connection. And at 200 meters of the RES network, which they refuse to connect to us, because can’t enter private territory, is it legal? And what do we do?

    To answer
    • Admin

      Hello! Try to make an official request a letter with the entry number and ask for an official answer, with links to laws and regulations, and then to lawyers or write an answer here!

      To answer
  • Eugene

    Spent the light on the land in 2017 for 550 ... waited about three months. A little tinkering with the docks ... and the cost of materials from the pillar ... and by the way the meter is on the street on the pillar ....

    To answer
  • Budzko Lyudmila

    Good day to all! Such a question: from our HUTOR (we are there alone) to the power line of 240 meters, but they refused to connect us there, but can we ask to put a step-down transformer? And then they requested 2.5 million for the transmission of light from the village !!! Thank you for your reply. Best regards, L.M.

    To answer
  • Svetlana

    I looked at prices - 30 or more thousand, and thought that maybe for this money you can buy solar panels and a windmill (getting electricity from solar energy and wind). On Aliexpress I saw some kind of hybrid station (both solar panels and a wind turbine) for 70,000, but there is also cheaper. Only from whether it is convenient ...

    To answer
    • Nikolay

      Svetlana They wrote a bunch of bullshit, do not believe it. connection to the land plot (construction) from 300 rubles; 550 rubles. and if within a radius of 500 meters there is no 10-15 kW line And there is a higher one, installation of a step-down transformer is required rather at your expense. If further500 meters, either at your own expense or options need to be specifically considered. Contact your energy market for the right advice.

      To answer
  • Olga

    Hello! It may be off topic and there will be many letters, but I will be grateful for the information. I am a complete zero in this area. We have a plot in SNT. We independently applied to the power grid with an application for technological connection (we attached documents, maps). The answer came "in the application there is no information for the preparation of the contract and technical conditions for technological connection to electric networks, namely the full name of the connection object (the land plot is not an energy receiving device)". And what can be an energy receiving device on an empty land plot ???????? The plans to build a house and other household buildings. How to build without electricity?

    To answer
  • Tatyana

    Good afternoon. A new village is being built in the field. Everyone has light, except us. Filed documents. Now the rejection has come. On the Google map, the distance between the sections is 32 meters. But in fact, the specialist went out, measured the STEPS distance and counted from the column of neighbors to the border of our site (in a straight line) less than 25 meters. And he refused to install a post for 550. He said that we should buy a pillar and install it ourselves.
    It bothers me that he did it in steps. May I challenge this decision. And how much should be the distance between the sections and between the pillars, so that we will be set at a reduced price (550 rubles)?

    To answer
    • Admin

      300 meters in cities and 500 meters in rural areas, according to PP861 you do not have to install anything. 25 meters is measured from the boundary of the plot "inward".

      To answer
      • Eugene

        Good afternoon, I am the owner of the SNT site in the city of Magnitogorsk, the question arose about connecting electricity, a post has already been installed on the next site since last year, they installed it for 16t.r., we were told in SNT yesterday the amount of 26t.r. for the pillar, in connection with this, questions arise: 1. Do I need permission from a neighbor to join, as I understand it is illegal. 2. Do I install poles by law or the power grid? 3. And is there any need to put a pillar in each section after 10 meters, if each has its own counter?

        To answer
  • Kate

    How long do you give permission to connect.

    To answer
  • Onegin

    Hello! I want to lend light to my peasant farm, the distance from the power line is one and a half kilometers. tell me how to be what to do and how much can it cost me at least about? thanks in advance!

    To answer
  • Alexei

    I am the owner of a land plot in STT in the Moscow region. I began to find out from the chairman how much the light will cost on my site. The amount announced to me in 100t.r. Pillars on the border are neighbors have electricity. Is it possible to conduct light cheaper through Mosenergo for example? Since the chairman told me that there aren’t any options except for 100t.r

    To answer
    • Novel

      I will help with those. joining.

      To answer
      • Armen

        Hello! Can you help with the connection of electricity to several sites in the Dmitrov district of Moscow Region? We plan to divide a plot of 4 hectares into approximately 40 pieces. While there is no light on the site. Around everyone there is light and is in empty areas including.

        To answer
  • Nikolay

    In SNT, to restore order in the payment of electricity, they wanted to connect to the moesk. (Everything is in working condition). Only for re-issuing a standard form requires 20-30 tr. Plus 20t.r for new meters, poles and cable. Which organization controls this situation?

    To answer
  • Oleg

    Hello! Got TU from moesk. 7.1. 1 point - newly installed support VL-0,4kV, departing from the section RU-0,4kV
    MTP-10 / 0.4kV 0796 - 25 kW.
    To the nearest post from the border of the site no more than 25 m2. He is standing across the road. A moesk suggested putting another pillar at the border of my site at my expense. Is moesk right?

    To answer
  • Anna Domashuk

    We have plots out of town for private housing, Aksaysky district, Rostov-on-Don. For large families, they do nothing. Land plots, poles from plots farther than 500 meters. What should we do? Officials are dark and do nothing. And we need light to build up. What to do, tell me? grid company IDGC of the South has 3 offices in Aksay.

    To answer
  • Natalya

    Good afternoon! in March 2019, they acquired a plot that is in a horticultural partnership (the partnership exists on paper, but in fact it has long been gone) the owner sold the land. The plans to build a house. They asked for a light, they refused us, they didn’t even accept the statement, they said that under the new law the chairman of the ST should apply (and he is no longer there). How can I conduct electricity? Astrakhan

    To answer
    • Irina

      Natalya, you spent electricity. Share your experience ... I also have a plot in Astrakhan on Garazhnaya Street and there is no light in any country))) what to do))) Share the experience please)))