How to connect 2 loads with a delay time for switching on?

Help me please. Need a switching device for 2 loads with the middle position of the contactor. The load is not more than 50 W, device for 220v. After switching the device to the left or right shoulder, the device should have a time delay for turning off the load from 0 to 1 minute, approximately. Regards to you. I will really wait for your advice.

Scheme of load connection via time relay

Loading...

One comment

  • Admin

    This option can be implemented on two contactors and two time relays with a trip delay. One contactor supplies voltage to load 1, we set the time relay in series with the control coil of the first contactor. The same thing - the second contactor supplies voltage to load 2, the second time relay in series with the coil of the second contactor. For control, you can put the control key with a return, which has three positions - the average is zero and when you deviate to the left side includes one load, when you deviate to the right side - the second load. Or put two buttons on the inclusion of 1 and 2 loads. Well, provide a shutdown button just in case.

    To answer

Add a comment